EXHST. HOOD6-BURNER RANGECONVECTION OVEN3-COMP. SINKGREASE TRAPWALK-IN COOLERHAND SINKSTAINLESS PREP TABLEGAS SUPPLY LINE — PRESSURED & CERTIFIEDTOTAL FOOTPRINT: 48'-0"BUILDOUT KITCHEN SYSTEMSCOMMERCIAL ELEVATION — SHEET 01

Philadelphia · Licensed · Permitted · Built

From Empty Shell
to Open Kitchen.

We gut the space, weld the hoods, set the grease traps, pressure the gas lines, and hand you the health department sign-off. Fixed price. Real timeline.

147
Kitchens Permitted
100%
Final Inspection Pass Rate
6 wk
Avg. Build Timeline

Completed Builds

Kitchens You Can Drive Past Today

Every project below has a permit number, a named inspector, and a real invoice. No renders. No stock photos of kitchens we didn't build.

Stainless steel commercial kitchen with hood ventilation and prep line for taqueria
Restaurant Build

Kensington

48-Seat Taquería

1,200 sq ft

Final Invoice

$84,400

No change orders

Build Time

7 weeks

Start to sign-off

Permit Record

L&I #2025-KC-0471

Inspector D. Reyes, Philadelphia Dept. of Public Health

Multi-station ghost kitchen with four separate prep lines and shared hood system
Ghost Kitchen

Fishtown

Ghost Kitchen — Four Concepts

2,400 sq ft

Final Invoice

$162,800

No change orders

Build Time

9 weeks

Start to sign-off

Permit Record

L&I #2025-FT-0892

Inspector M. Okafor, Philadelphia Dept. of Public Health

Clean licensed commercial kitchen in converted church fellowship hall with three-compartment sink
Institutional

South Philly

Church Catering Facility

800 sq ft

Final Invoice

$51,200

No change orders

Build Time

5 weeks

Start to sign-off

Permit Record

L&I #2025-SP-1104

Inspector T. Washington, Philadelphia Dept. of Public Health

Compact commissary kitchen with prep stations and cold storage for food truck operators
Commissary

Northern Liberties

Food Truck Commissary

650 sq ft

Final Invoice

$38,900

No change orders

Build Time

4 weeks

Start to sign-off

Permit Record

L&I #2025-NL-0337

Inspector A. Patel, Philadelphia Dept. of Public Health

How It Works

Three Phases. One Contract. Zero Surprises.

You sign the lease. We handle everything from the first site walk to the health department stamp. Fixed-price means the number on the proposal is the number on the final invoice.

01

Day 1–3

Site Walk & Scope

We walk the space with a tape measure and a mechanical engineer. Every hood location, drain rough-in, and gas stub gets marked in pencil before a dollar changes hands.

  • Measured floor plan
  • Equipment layout drawing
  • Fixed-price proposal
  • Permit timeline estimate
02

Weeks 1–6

Permitted Build

Our crew handles structural, mechanical, plumbing, and electrical — all under one contract. We pull every permit, schedule every inspection, and manage every subcontractor.

  • All permits pulled
  • Hood & suppression installed
  • Grease trap set & connected
  • Gas lines pressured & certified
03

Final Week

Health Dept. Sign-Off

We schedule the health department walk-through and stay on-site for the inspection. We don't hand you the keys until the inspector stamps the certificate of occupancy.

  • Health dept. pre-inspection
  • Final L&I sign-off
  • Certificate of occupancy
  • Equipment commissioning

Fixed price means fixed price.

If the inspector asks for additional work, we absorb it. No change orders, no surprises at close-out.

See Package Pricing

Fixed-Price Packages

Lock In Your Build Price

Three packages. Real numbers. The price on the card is the price on the invoice — equipment, permits, labor, and health department sign-off included.

Food Truck Commissary

The minimum viable permitted kitchen

$34,000starting

Fixed. No asterisks.

Square Footage

400 – 800 sq ft

Timeline

4 weeks to permit

Equipment Included

  • 2-compartment prep sink
  • Hand sink
  • Single-bay stainless prep table
  • Grease trap (under-sink)
  • Floor drain w/ grease interceptor rough-in
  • NSF-certified refrigeration unit

Permits Pulled

  • Plumbing permit
  • Food facility license
  • Health dept. certificate

Best for: Food truck operators, caterers, cottage bakers scaling up

Lock In Food Truck Commissary Price
Most Common Build

Single-Line Restaurant

A full cook line, ready to open

$74,000starting

Fixed. No asterisks.

Square Footage

900 – 1,600 sq ft

Timeline

6–7 weeks to permit

Equipment Included

  • 6-burner commercial range + convection oven
  • Type I exhaust hood w/ Ansul suppression
  • 3-compartment sink + hand sink
  • Walk-in cooler (8×10)
  • Grease trap (external, city-spec)
  • Stainless prep tables (12 LF)
  • Gas lines pressured & certified

Permits Pulled

  • Building permit
  • Plumbing & mechanical permits
  • Fire suppression permit
  • Health dept. pre-inspection & certificate
  • L&I certificate of occupancy

Best for: First-time restaurant owners, fast-casual operators, bar kitchens

Lock In Single-Line Restaurant Price

Full Production Kitchen

Multi-concept or high-volume output

$148,000starting

Fixed. No asterisks.

Square Footage

1,800 – 3,500 sq ft

Timeline

9–10 weeks to permit

Equipment Included

  • Dual cook lines w/ multiple hoods
  • Blast chiller + walk-in cooler & freezer
  • Commercial dishwasher (high-temp)
  • Full grease interceptor system
  • Mop sink + multiple hand sinks
  • Stainless shelving throughout
  • Dedicated prep & packaging zones

Permits Pulled

  • Full building, plumbing, mechanical permits
  • Multiple fire suppression permits
  • Health dept. staged inspections
  • Certificate of occupancy

Best for: Ghost kitchen operators, catering companies, institutional kitchens

Lock In Full Production Kitchen Price

Prices shown are starting figures for standard builds in the Philadelphia metro area. Final scope confirmed after site walk — usually within $2,000 of the package rate.

From the Operators

Real Kitchens. Real Numbers. Real Names.

We don't anonymize testimonials. Every person below runs a kitchen you can visit.

Marcus Rivera, owner of Taquería Dos Calles, smiling in his restaurant

Marcus Rivera

Owner, Taquería Dos Calles

Kensington Ave & Allegheny

"I signed my lease on a Friday. Buildout walked the space Monday morning and had a fixed price in my hands by Wednesday. Seven weeks later I had my certificate of occupancy. I've watched other operators spend six months and twice the money going the general contractor route."

Final Invoice

$84,400 — exactly as quoted

Permit Sign-Off

Signed off by Inspector D. Reyes

Priya Nambiar, operator of Fishtown Food Hall, standing in industrial kitchen

Priya Nambiar

Operator, Fishtown Food Hall

Frankford Ave & Girard

"Converting a warehouse into four ghost kitchen concepts sounded insane on paper. Buildout mapped out every shared hood zone, every separate drain line, every concept's dedicated prep area. The health department inspector told me it was one of the cleanest submissions she'd seen. That quote came from the inspector, not from us."

Final Invoice

$162,800 — no change orders

Permit Sign-Off

Signed off by Inspector M. Okafor

Pastor Darnell Washington of Greater Zion Baptist Church standing in newly licensed kitchen

Pastor Darnell Washington

Senior Pastor, Greater Zion Baptist Church

Broad St & Federal, South Philly

"Our fellowship hall sat unused six days a week. We wanted to license it for catering and community cooking classes. Every contractor we called said it was too complicated — grease traps in a 1940s building, low ceilings, the works. Buildout took one look and said they'd handled worse. They were right."

Final Invoice

$51,200 — under initial estimate

Permit Sign-Off

Signed off by Inspector T. Washington

Get Your Fixed Price

Start With a Site Walk

Fill this out and we'll reach out within one business day to schedule your free site walk. No obligation until you sign the proposal.

No sales pressure. No obligation until you sign the proposal. We'll come to the space, not the other way around.